{"id":36114,"date":"2026-06-15T08:40:32","date_gmt":"2026-06-15T08:40:32","guid":{"rendered":"https:\/\/www.espichegolf.pt\/?p=36114"},"modified":"2026-06-18T10:07:55","modified_gmt":"2026-06-18T10:07:55","slug":"course-works-update-summer-2026","status":"publish","type":"post","link":"https:\/\/www.espichegolf.pt\/en\/course-works-update-summer-2026\/","title":{"rendered":"Course Works Update: Summer 2026"},"content":{"rendered":"\n<p>At Espiche Golf, we are committed to providing excellent playing conditions year-round. As part of this commitment, we would like to inform you of important course maintenance and improvement projects taking place this summer.<\/p>\n\n\n\n<p><strong>Hollow Coring of Greens:<\/strong><strong><br><\/strong>The next greens hollow coring work will take place from June 29 to July 2. This vital maintenance process helps to:<\/p>\n\n\n\n<p>&#8211; Improve drainage<\/p>\n\n\n\n<p>&#8211; Reduce soil compaction<\/p>\n\n\n\n<p>&#8211; Stimulate healthy root growth<\/p>\n\n\n\n<p>While this work may cause some short-term disruption, the long-term benefits to the quality of the greens and playability are substantial. We thank you in advance for your understanding and support during this period.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"550\" src=\"https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/Hollow-coring.jpg\" alt=\"\" class=\"wp-image-36115\" srcset=\"https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/Hollow-coring.jpg 1024w, https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/Hollow-coring-300x161.jpg 300w, https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/Hollow-coring-768x413.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<div style=\"height:35px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Improvement Highlights<\/strong><\/h2>\n\n\n\n<p><strong>Equipment Update<\/strong><\/p>\n\n\n\n<p>Over the past months, we have received two key additions to the maintenance fleet:<\/p>\n\n\n\n<p>&#8211; A new CASE backhoe loader\u00a0<\/p>\n\n\n\n<p>&#8211; A new electric greens mower<\/p>\n\n\n\n<p>These upgrades are now fully operational and support improved efficiency, performance and sustainability in our course maintenance operations.<\/p>\n\n\n\n<div style=\"height:35px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"763\" height=\"450\" src=\"https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/New-electric-machine2.jpg\" alt=\"\" class=\"wp-image-36133\" style=\"width:840px;height:auto\" srcset=\"https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/New-electric-machine2.jpg 763w, https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/New-electric-machine2-300x177.jpg 300w\" sizes=\"auto, (max-width: 763px) 100vw, 763px\" \/><\/figure>\n\n\n\n<div style=\"height:35px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Irrigation System<\/strong><\/p>\n\n\n\n<p>We continue to make steady progress on the irrigation system across the course, focusing on optimisation and long-term reliability.<\/p>\n\n\n\n<p>This remains a key ongoing priority to ensure consistent playing conditions and improved water efficiency throughout the course.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1013\" height=\"760\" src=\"https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/Irrigation.jpg\" alt=\"\" class=\"wp-image-36121\" srcset=\"https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/Irrigation.jpg 1013w, https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/Irrigation-300x225.jpg 300w, https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/Irrigation-768x576.jpg 768w\" sizes=\"auto, (max-width: 1013px) 100vw, 1013px\" \/><\/figure>\n\n\n\n<div style=\"height:35px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>Tees Improvement \u2013 Hole 5<\/strong><\/p>\n\n\n\n<p>Works on Hole 5 tees have now been completed, including:<\/p>\n\n\n\n<p>&#8211; Replacement of irrigation pipes and sprinklers\u00a0<\/p>\n\n\n\n<p>&#8211; Extension of the yellow tees\u00a0<\/p>\n\n\n\n<p>&#8211; Installation of a 1.2 mm protective membrane beneath the turf. This membrane helps prevent root intrusion from surrounding trees and vegetation, ensuring improved tee quality, stability and long-term performance.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"578\" src=\"https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/Works-Hole-5-1-1024x578.jpg\" alt=\"\" class=\"wp-image-36124\" srcset=\"https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/Works-Hole-5-1-1024x578.jpg 1024w, https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/Works-Hole-5-1-300x169.jpg 300w, https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/Works-Hole-5-1-768x433.jpg 768w, https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/Works-Hole-5-1.jpg 1115w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<div style=\"height:35px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/Works-Hole-5-2-1024x768.jpg\" alt=\"\" class=\"wp-image-36127\" srcset=\"https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/Works-Hole-5-2-1024x768.jpg 1024w, https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/Works-Hole-5-2-300x225.jpg 300w, https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/Works-Hole-5-2-768x576.jpg 768w, https:\/\/www.espichegolf.pt\/wp-content\/uploads\/2026\/06\/Works-Hole-5-2.jpg 1188w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>At Espiche Golf, we are committed to providing excellent playing conditions year-round. As part of this commitment, we would like to inform you of important course maintenance and improvement projects [&hellip;]<\/p>\n","protected":false},"author":368,"featured_media":36118,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[60],"tags":[],"class_list":["post-36114","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-golf"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.espichegolf.pt\/en\/wp-json\/wp\/v2\/posts\/36114","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.espichegolf.pt\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.espichegolf.pt\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.espichegolf.pt\/en\/wp-json\/wp\/v2\/users\/368"}],"replies":[{"embeddable":true,"href":"https:\/\/www.espichegolf.pt\/en\/wp-json\/wp\/v2\/comments?post=36114"}],"version-history":[{"count":5,"href":"https:\/\/www.espichegolf.pt\/en\/wp-json\/wp\/v2\/posts\/36114\/revisions"}],"predecessor-version":[{"id":36183,"href":"https:\/\/www.espichegolf.pt\/en\/wp-json\/wp\/v2\/posts\/36114\/revisions\/36183"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.espichegolf.pt\/en\/wp-json\/wp\/v2\/media\/36118"}],"wp:attachment":[{"href":"https:\/\/www.espichegolf.pt\/en\/wp-json\/wp\/v2\/media?parent=36114"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.espichegolf.pt\/en\/wp-json\/wp\/v2\/categories?post=36114"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.espichegolf.pt\/en\/wp-json\/wp\/v2\/tags?post=36114"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}